Directory

Contact

Site map

Legal notice

 français
 english

 20/12/2007

 

A centerpiece for an offshore platform

Our industrial projects teams have transported a pulling rig* in Korea. The 320 tons piece left the factory and was led 6 kilometers away to the Ulsan’s bay (Korea). The size of the piece (8 meters long, 11 meters large and 14 meters high) required the cut of tension lines during a whole night. The pulling rig was then raised on a barge so as to be loaded on a FPSO on the other side of the bay. The FPSO (a movable offshore platform), was heading towards Nigeria.

* A pulling rig is used as a big hoist on a movable offshore platform (FPSO).







See previous events